Construction Delays

Construction Delays


Return to Construction
Article Index

Delays

Delays are recorded as the job moves through the construction stage. Framework ECM will automatically monitor the allowances and inform of delays to be claimed once the allowance has been reached. All delays for a job are entered on the Delays screen before they can be selected for a delay claim.

The Delays screen contains a list of standard delay type, such as rain, late labour, etc.

Delays can also be entered on a supervisor's tablet using Framework Logistics Tablet.

image-20240722-022524.png

Procedures

Creating A Batch Delay

  1. From the View drop-down, select a view.

  2. Click Batch. The Batch Delays dialog will be displayed.

  3. Enter the details.

  4. Click OK. The dialog will close and the batch delays will be performed for the selected jobs.

Creating A Delay

  1. From the View drop-down, select a view.

  2. Click New. The Delay dialog will be displayed.

  3. Enter the details.

  4. Click OK. The dialog will close and a new delay will be created.

Batch Delays Dialog

This dialog is used to create a delay and delay claim for multiple jobs.

Batch Delay Job Filter Group

Field

Description

Field

Description

Filter By

A filter can be selected that determines which jobs will be displayed in theJobs list. Click the Filter By drop-down list to select.

Example: All Jobs in Construction, All Jobs to PCI Stage, All Jobs to Fix Stage.

Actions Group

Field

Description

Field

Description

Create Delay?

Is a delay to be created?

  • Yes (default): A delay will be created.

This field is locked and cannot be edited.



Create Delay Claims?

Is a delay claim created for the selected jobs?

  • No (default): A delay claim will not be created for the selected jobs.

  • Yes: A delay claim will be created for the selected jobs. ThePrint Delay Claims? field must be selected.

Print Delay Claims?

Will the delay claims be printed?

This field is only available when the Create Delay Claims?field is Yes.

  • No (default): The delays (and delay claims, if applicable) will be created without a report being available.

  • Yes: Once delays (and delay claims, if applicable) are created, the Report dialog is displayed allowing selection of the required report.

Jobs List

Column

Description

Column

Description

Select

Indicates whether a job's delays and delay claims will be processed. Click the corresponding cell to select/deselect.

Job #

Number of the job.

Client Name

Client name of the job.

Job Address

Job address of the job.

Supervisor

Construction supervisor for the job.

Stage

Current construction minor stage of the job.