Article Index
Construction Logistics Desktop Version 8 Headlines
Logistics Tablet now uses the Entitlement’s system
Logistics Activity Colour Coding
Logistics SupplierConnect/MAPI Replacement
Resource Centres
The F1 action now takes the user to the Logistics Tablet Resource Centre. In addition to the user guide, there are several other spaces with useful information
Logistics Tablet User Guide - The user guide
Logistics FAQ - Provides articles on frequently asked questions.
Logistics Best Practice - Provides articles which show some best practice usage of ECM.
Logistics Technical Resources - Provides technical articles for the IT department.
Logistics Release Information - Provides information on what was delivered in both major and patch releases.
Construction Logistics Tablet Version 8 First Release (Version 8.0.XXXXX Published xx/xx/23)
Description | Area | Type | Detail | Guide | Dev # | Support # |
---|---|---|---|---|---|---|
Synchronise framework (Delays without a Date) | Delays | Change | When adding construction delays in Framework ECM or Tablet (see group scheduler and single-job delays views) a delay date must be entered This is either the single day of the delay, or the start of an delay period and/or open delay You cannot save a delay record without the delay date populated. |
| 53282 | 24949 |
Tablet preferences for Smart Sync options | Preferences | New | A preference to allow the default behaviour of Notification Emails has been added | Pending | 53279 | 23833 |
Add bulk notes to tasks | Tasks | New | A new "Bulk Comments" feature has been added to the Group Scheduler Multiple call forward item dialog changes have been made: | Pending | 52883 | 22790 |
Single Call Forward - Bulk Approve | Call Forward | New | A Bulk Approve option has been added | Pending | 24321 | 24321 |
Startup Check for Minimum SQL Version 2012 | SQL Minimum Version | Change | A startup check, for the SQL version,on the Tablet has been added The minimum supported version is SQL 2012 (or v11.0.x) |
|
| 27510 |
Construction Admininistrator Allocation in Logistics | Logistics | New |
|
| 55702 -SP | 22963 |
Cost centre and load columns to the diary screen | Diary | New | The Cost Centre and Load columns for activities, are shown, on the Diary MDI, the same as they appear in the normal Call Forward MDI (next to the activity) | Pending | 20106 |
|
Missing Claims Check / Call-Off Rules for Claims | Claims | Change |
| Pending | 33454 |
|
Simple View | Group Scheduler |
|
| Pending | 33582 |
|
Sync Times | Synching | Improvement | General improvements have been made to overall synchronisation times | Pending | 59246 | 32842 |
Comments MDI Column Widths | Comments | Change | The Staff column has been relabelled "Contact" and is now a fixed width. All additional space in the list when resizing is given to the Comment column, | Pending | FWALL-163 | N/A |
Tablet preferences for Smart Sync options | Preferences | New |
| Pending | 53279 | 23833 |
Add the cost centre and load columns to the diary screen | Diary | New | The Cost Centre and Load columns for activities are noew shown on the Diary screen, the same as they appear in the normal Call Forward screen (next to the activity) | Pending | 56522 | FWALL-144 |
Simple View Group Scheduler | Group Scheduler | New |
| Pending | 58773 | 33582 |
"Goods Received" for Work Orders | Work Orders | New |
| Pending | 60298 | 21609 MF |
Cancel Work Order which is in Final Status | Worders | New |
| Pending | 61598 | 13388 |
Option to select DMS File Sync | Synchrinising | New |
| Pendng | 61578 | 37466 |
Logistics Activity Colour Coding | Activities | New |
| Pending | 62820 | 38584 |
Batch claims email preferences | Batch claims | Change |
| Pending | 63741 | 34132 |
Logistics Activity Colour Coding | Logistics | New | Colour coding of construction activities has been introduced in Construction Logistics. Colour coding allows a builder to attach specific meaning to construction activities, and for this to be visible to all users across all Framework Logistics applications. The number of colours available is extensive, and they can be used for any desired purpose. | 62820 | 38584 | |
Group Scheduler Filter for Completed Activities | Group Scheduler | New | There is a new check-box criteria option in the Group Scheduler Criteria/Filter dialog - The default for this is Off - The user's selection is remembered for their session. The heading/label is "Job Criteria" When enabled, the results should exclude any jobs/rows from the scheduler where all activities included in the view are either complete (what we show as green), or are N/A (what we show as grey | Pending |
| FWALL-152 |
Sprint 132 Patch Update
Description | Area | Type | Detail | Guide | # |
---|---|---|---|---|---|