Logistics Bulk Call Up to Support Unlinked POs | Call ups | Change | An "Assumed" call up for bulk operations was added.
When an activity included in the bulk call up does not have any linked POs a call up, is sent, assuming the PO being referred to. If the activity is not linked to any order, the orders on the cost centre are reviewed. If there is only one order on the cost centre for the supplier of the activity, this must be the order we're referring to and calling up. This is regardless of whether the order is linked to another (different) activity, or not
The comment that is added to the item on call up is updated in this situation, with extra text at the end of the comment that reads: "Note: Call Up PO used is assumed, as the single unlinked order on this cost centre for this supplier." | N/A | 52056 | 23837 |
Tablet Mark Up for Attachments | Attachments | Change | An "Attach All" button has been added the files tab(s), that allow all files in a selected folder (ie. shown in the top list) to be added all at once.
If some of the files have already been added, and this button is then used, the remaining (ie. not already added) files are added. | N/A | 52675 | 24299 |