The Building Variation screen is used to manage variations to the contract. Building variations that have a Final status and that are signed are included in the Construction Final Variation List (FVL) document.
Procedures
Creating A Building Variation Document
...
- From the Building Variations list, select the required tender document.
- Click Edit. The General tab of the Document dialog will be displayed.
- Click the Status popup button. The Select Document Status dialog will be displayed.
- From the Document Status list, modify the status.
- Click OK. The dialog will close and the status will be updated.
- Modify other details, as required.
- Click OK. The dialog will close and the building variation document will be modified.