For this to work, jobs in Timberline must be setup as Contracts billing method. A job must also have all cost codes entered against it.
...
Info |
---|
This procedure assumes that integration has been installed and configured with all site specific requirements. |
Updating Framework Claims From Timberline
...
The following procedure describes how to perform a consistency check on claim and payment data between Framework and Sage Timberline.
Info |
---|
...
This procedure assumes that integration has been installed and configured with all site specific requirements. |
Performing A Consistency Check
...
- Review the email sent by integration that indicates success/failure and lists any issues encountered.
...
Info |
---|
The consistency check does not change data in either Framework or Sage Timberline. It simply logs any consistency issues that must be resolved by manual user intervention. |
Performing Integration - Automatic
...