For this to work, jobs in Timberline must be setup as Contracts billing method. A job must also have all cost codes entered against it.

...

Info
This procedure assumes that integration has been installed and configured with all site specific requirements.

Updating Framework Claims From Timberline

...

The following procedure describes how to perform a consistency check on claim and payment data between Framework and Sage Timberline.

Info

...

This procedure assumes that integration has been installed and configured with all site specific requirements.

Performing A Consistency Check

...

  • Review the email sent by integration that indicates success/failure and lists any issues encountered.

...

Info
The consistency check does not change data in either Framework or Sage Timberline. It simply logs any consistency issues that must be resolved by manual user intervention.

Performing Integration - Automatic

...