...
The Image tab is used to insert a full size image against the standard item.
Image
Displays the image recorded against the standard item.
...
Important: BOQ links are ONLY required if information is integrated between Framework ECM and an external estimating system.
The BOQ Links tab is used to manage the Bill Of Quantities (BOQ) links for a standard item.
...
The details in this list can be edited using the BOQ Link dialog (see BOQ Link Dialog).
Column | Description |
---|---|
# | Order of the BOQ link on the BOQ Links list. BOQ links may be moved to a different position in the list by using the directional buttons on the toolbar. |
Primary | Indicates the primary BOQ link. The primary BOQ link is indicated with a icon. |
QTY | BOQ link quantity. |
Qty Method | Selected quantity method for BOQ links. |
BOQ Reference | BOQ reference item in an estimating system for the standard item. |
Export | Export method for the BOQ link from Framework ECM to an external estimating system. |
Pricing | Sales pricing import method for the BOQ link from an external estimating system to Framework ECM. |
Notes | Free text area for notes regarding the BOQ link. |
...